Start up
DRYPOINT
®
RS 15 – 1700 HP50 NA 13
3. Start up
3.1. Preliminary Operations
CAUTION!
Exceeding of operating parameters!
Verify that the operating parameters match with the nominal values stated on the data nameplate of the dryer
(voltage, frequency, air pressure, air temperature, ambient temperature, etc.).
This dryer has been thoroughly tested, packaged and inspected prior to shipment. Nevertheless, the unit could be
damaged during transportation, check the integrity of the dryer during first start-up and monitor operation during the first
hours of operation.
Qualified personnel must perform the first start-up.
When installing and operating this equipment, comply with all National Electrical Code and any applicable
federal, state and local codes.
Who is operating the unit is responsible for the proper and safe operation of the dryer.
Never operate equipment with panels removed.
3.2. First start-up
3.2.1. First start-up DRYPOINT RS 15- 450 HP50 NA
This procedure should be followed on first start-up, after periods of extended shutdown or following
maintenance procedures.
Qualified personnel must perform the start-up.
Sequence of operations (refer to paragraph 5.1 Control Panel).
Ensure that all the steps of the “Installation” chapter have been observed.
Ensure that the connection to the compressed air system is correct and that the piping is suitably fixed and
supported.
Ensure that the condensate drain pipe is properly fastened and connected to a collection system or container.
Ensure that the by-pass system (if installed) is open and the dryer is isolated
Ensure that the manual valve of the condensate drain circuit is open.
Ensure that the cooling water flow and temperature is adequate (Water-Cooled).
Remove any packaging and other material which could obstruct the area around the dryer.
Activate the mains switch.
Turn on the main switch - pos. 1 on the control panel.
Ensure that the electronic instrument is ON.
Ensure the consumption matches with the values of the data plate.
Ensure the fan work properly - wait for its first interventions (Air-Cooled).
Allow the dryer temperature to stabilise at the pre-set value.
Slowly open the air inlet valve.
Slowly open the air outlet valve.
Slowly close the central by-pass valve of the system (if installed).
Check the piping for air leakage.
Ensure the drain is regularly cycling - wait for its first interventions.